Skip to content

Bridges and water

Where the ideal line of a road rides high above the ground (across a gorge or a deep valley), or crosses water, the Road Network builds a bridge instead of a huge embankment. The terrain under the bridge is left as it was, and the bridge deck is exported as a BeamNG MeshRoad, its top flush with the road.

A bridge where the road would ride high above a valley, and on the deck

Bridge spans show in cyan on the road lines in the editor’s 3D view.

The node first works out the profile the road would like (smoothed and grade-limited), then looks for stretches where that profile is more than Bridge Min Clearance above the ground, or over water. Each stretch is extended by Bridge Abutment at both ends, so the deck lands on solid ground, and becomes a straight bridge between them, unless:

  • it is longer than Bridge Max Span: the road keeps an embankment instead,
  • it is within 30 m of the road’s junction with another road.
Setting
Bridges Builds bridges at all. Off, every crossing is an embankment.
Bridge Min Clearance How high above the ground the road must ride to get a bridge (6 m). Raise it for fewer, larger bridges.
Bridge Max Span The longest bridge (250 m).
Bridge Abutment How far each bridge reaches past the gap onto the ground (6 m).
Bridge Water Clearance How high the deck stays above water (3 m).
Bridge Deck Depth The thickness of the exported deck. Export only.
Bridge Top / Bottom / Side Material The deck’s materials. Export only.

With a Water node before the Road Network, the routes avoid water (see Water Crossing Cost), and where a road does cross a river or a lake:

  • it gets a bridge whose deck stays Bridge Water Clearance above the water, or
  • where no bridge can be built (too long, too near a junction, or Bridges off), a causeway: the road is raised 1 m above the water on an embankment.

A road is never under water.

A bridge across a river of a Water node